Spaze was established in 2006 with avision to revolutionalise real estate sector in India, and today it is recognized as progressive and innovative real estate company, with development in various promising locations in Gurgaon, especially the stratigically located Sohna Road. The ground floor and the first floor will exclusively be for the Retail shops, and above that would be the Service apartments with all modern facilities.
...
Amenities of Boulevard Ii
-
Vaastu Compliant
-
Security / Fire Alarm
-
Centrally Air Conditioned
-
RO Water
-
System Piped Gas
-
Air Conditioned
-
24 Hrs. Water
-
24x7 Power Backup
-
Wi-fi Connectivity
-
ATM
-
Yoga & Aerobics
-
Reserved Parking
-
Lift
-
Service/Goods Lift
-
Sports complex
-
Kids Play Area
-
Health Club
-
Cafeteria/Food Court
-
Jogging Track
-
Security System
Specifications of Boulevard Ii
- StructureRCC Framed Structure.
- Wall Finishing ExternalDouble coat Ace/Apex emulsion paint over a primary Coat.
- WallsClay bricks / Fall -G masonry with cement mortar.
- Sit outsKajaria / Johnson Ceramic/Porcelain tiles.Plumbing & sanitary
Concealed plumbing with Branded CP and sanitary ware fittings.
- Elevators standard make & suitable capacity lifts shall be provided.
- Electrical Concealed copper wiring with switches of sin type/ modular reputed make with adequate light ,fan and power points.
- T.V, Telephone & Internet Provided points of T.V and telephone, provision for intercom facility.
- Car parking area CC paving shall be provided at stilt floor car parking.
Payment Plan
-
On Booking
10% of BSP
-
Within 45 days of Booking
15% of BSP
-
On Commencement of Excavation Work
10% of BSP
-
On Commencement of First Basement Slab
10% of BSP + 50% EDC & IDC
-
On Commencement of 1st Floor Slab
7.5% of BSP + 50% EDC & IDC
-
On Commencement of 4th Floor Slab
7.5% of BSP + 50% PLC
-
On Commencement of 7th Floor Slab
7.5% of BSP + 50% PLC
-
On Commencement of 13th Floor Slab
7.5% of BSP+ 50% Right to use Car Parking
-
On Commencement of Top Floor Slab
7.5% of BSP + 50% Right to use Car Parking
-
On Commencement of Façade work
7.5% of BSP
-
On Commencement of Flooring work
5% of BSP
-
On Offer of possession
5% of BSP + 100% (Stamp Duty + Registration Charges + IFMS + All other additional charges)
EMI Calculator
Total Interest Payable
34,90,279
Total of Payments (Principal + Interest)
59,90,279