Breez Global Heights 89 Sector 89 is an Upcoming affordable housing project is planned in 8.69 acres Of prime land near one of the prime locations of Gurgaon that is Dwarka Expressway Sector 89 Gurgaon. The Greenery in this region will keep you close to nature and make you feel fresh and energetic. It offers to deliver 2 BHK and 3 BHK spacious apartments with open and ventilated area.This project is coming with a new concept of dedicated car parking space like no other Affordable Housing Project before.This Gated Community Houses 1266 Families Dividing Them Into 15 High Rise Towers, Each With The Configuration Of 2 BHK And 3 BHK Unit. Located On 75 Meter Wide Road Near IMT Manesar.
At Global Heights 89, there's something for everyone. An outdoor gym where fitness enthusiasts could pursue their goals. A party lawn for you to celebrate under the skies. And a aroma garden where you could hang out on weekends.
There is no doubt about the fact that in case of the residential houses,the location plays the number #1 role. Marked with the presence of most upscale residential projects in the vicinity, apartments at Global Heights 89 are entitled to the lucrative catchment, while enjoying proximity to renowned schools and hospitals.
Global Heights 89 Project Details:
- » File identification- LC- 4427A
- » Developer : MS JAMB PROPBUILD PVT. LTD. C/O BREEZ INFRA
- » Name Of Project : Global Heights 89
- » License No. 85 Of 2021 Dated 18/10/2021
- » Total Area of Project : 8.69 Acres Of Land.
- » Total Flats : 1266
- » Total Number of Towers : 15
- » Towers With G+6 To 19 Storey
- » Rates of carpet area basis
- » 90% home loan available
- » High quality doors and windows
- » 100% Power backup
...
Amenities of Global Heights 89
-
Vaastu Compliant
-
Security / Fire Alarm
-
24 Hrs. Water
-
24x7 Power Backup
-
Yoga & Aerobics
-
Gated Community
-
Reserved Parking
-
Gymnasium
-
Lift
-
Kids Play Area
-
Senior Citizen park
-
Meditation Court
-
Jogging Track
-
Waste Disposal
-
Maintenance Staff
-
Rain Water Harvesting
Specifications of Global Heights 89
- Structure RCC Framed Structure.
- Wall Finishing External Double coat Ace/Apex emulsion paint over a primary Coat.
- Walls Clay bricks / Fall -G masonry with cement mortar.
- Sit outs Anti Skid Ceramic/Porcelain tiles.Plumbing & sanitary
Concealed plumbing with Branded CP and sanitary ware fittings.
- Lobby Flooring Ceramic / Vitrifed tiles / IPS
- Electrical ISI Mark Products for wiring, Switches and Circuits
- Fixture And Fittings Single Bowl Stainkess Steel Sink & Modern CP Fittings
- Bike & Car parking available.
Explore Neighbourhood - Map View
- 5 Mins Drive Schools & College in the near Vicinity (eg. RPS Internatinaol School, DPS, Kings International, Royal Oak International, Alpine, Suncity, & Proposed Girls Govt Medical College)
- 5 Mins Drive Gurugram Railway Station
- 5 - 10 Mins Drive Proposed Metro Corridor
- 8 - 10 Mins Drive Sultanpur Bird Sanctuary
- 25 Mins Drive Indira Gandhi International Airport, New Delhi
- NH 8 Two way connectivity from Dwarka Expressway & NH-8
- Rail Corridor Proposed Railway Station near Sector 104 (Basai Dhancot)
- Nearby Hospital AIIMS OPD & Columbia Asia Hospital
- IT/ITeS Emerging as one of the prominent destinations for IT/ITeS companies
- Excellent Connectivity 18 km Elevated long expressway for seamless connectivity between South Delhi, Indra Gandhi International Airport, Gurugram and Manesar
Payment Plan
-
At the time of submission of the application for allotment
5% of BSP
-
Within Fifteen days of the date of issuance of allotment letter
20% of BSP
-
Within six months of the date of issuance of allotment letter- on completion of construction of raft and RCC slab upto- ground floor level
12.5% of BSP
-
Within twelve months of the date of issuance of allotment- letter on completion of construction of RCC slab upto 8th- floor level.
12.5% of BSP
-
Within Eighteen months of the date of issuance of allotment- letter on completion of construction of RCC slab upto 14th - floor level.
12.5% of BSP
-
Within twenty four months of the date of issuance of allotment- letter on completion of construction of RCC slab upto 19th floor- level of Tower 5 and completion of brick work of all the towers.
12.5% of BSP
-
Within thirty months of the date of issuance of allotment letter- on completion of internal finishing
12.5% of BSP
-
Within thirty six months of the date of issuance of allotment- letter on completion of external finishing and on application of- occupation certificate.
12.5% of BSP
EMI Calculator
Total Interest Payable
34,90,279
Total of Payments (Principal + Interest)
59,90,279